Short answer
For an event order the timeline runs backwards from the day the goods must be with you: distribution and packing time, delivery, production, print proof approval, and final artwork and size list. Get each step's duration from the manufacturer in writing; stock fabric, fewer colours and a fast-setting decoration method can shorten it.
Plan backwards
- Event day: the day the goods are handed out.
- Distribution time: getting the goods to teams or addresses.
- Delivery: shipment from the manufacturer to you or to the addresses.
- Production: starts after the print proof is approved.
- Print proof: colour and placement are approved here.
- Sign-off: artwork file, quantity and size list.
Decisions that shorten it
Choosing stock fabric and approving colour in advance shortens lead times [1]. Fewer print colours and a decoration method with a fast set-up also help.
What lengthens it
- Colour or fabric changes after sample approval
- Late size list or artwork
- Multi-colour printing or custom dyeing
- Multi-address delivery added at the last minute
If the date is fixed, say so
If you state up front that the date is fixed, the manufacturer can separate out the options that make it — and if none do, you find out early.
Copy this into your enquiry
- Event day: …
- Day the goods must be with us: …
- Delivery: one address / several
- Artwork ready: yes / no
- Size list ready: yes / no
- Date fixed: yes / no
This guide is general information, not the terms of any particular manufacturer. Turhan Prime's own terms are on the product pages and in the quote.
At Turhan Prime
Sources
- CBI — Buyer requirements for apparel — Netherlands Ministry of Foreign Affairs, last updated 4 June 2025